- Issue: Manual calculation of hours, overtime and overtime is time-consuming and the source of salary slip discrepancies.
- Key rules: Maximum of 8 hours per day and 44 hours per week (6 and 36 for hard and harmful), overtime with 40% extraordinary, night work 35% and Friday work as overtime.
- Solution: Daily recording of operation, periodic comparison with receipt and keeping track of all changes in a system.
- Role of Axis Puls: According to the product documentation, the program and its changes are provided to the administrator in a system of recording and reporting the functionality according to the access.
The working hours limit according to Iran's labor law
According to Iran's labor law, normal working hours 8 hours a day and 44 hours a week is This means that the standard weekly schedule (eg Saturday to Wednesday full time and Thursday part time) should not exceed 44 hours in total; Every working hour in excess of this ceiling, overtime is considered For hard and harmful work, the ceiling is lower: 6 hours a day and 36 hours a week; Because burnout occurs faster in these jobs and the law provides more protection.
Two basic concepts should be separated. duty hours, is the minimum time commitment of the individual in the period (eg months) to be covered. overtime overtime hours and work deficit The hours are less than that. At the end of each period, each person's actual performance should be measured by these three numbers: how much was owed, how much was added, and how much was recorded as a deficit. When these numbers are registered and visible, the legal debate will return to the number. For the treatment staff whose duty limit is subject to the Law of Productivity Promotion, article Nurses shift see
Overtime formula with an extraordinary 40%
According to the labor law, to every hour of overtime 40% extra on the normal hourly wage is awarded; That is:
Wage for each hour of overtime = Wage for one normal hour x 1.4
Educational example: if a person's normal hourly wage is 100 thousand tomans, each overtime hour is calculated as 140 thousand tomans. (The numbers are just to understand the formula.)
Important note for managers: Overtime must be done Ceiling and license have Overtime without a ceiling makes both the cost unpredictable and leads to wear and tear and quality loss. The correct rule is that the need for overtime work should be predicted and recorded in advance, the monthly limit of each person should be specified, and payment should be made based on the recorded work; No guesswork or verbal agreement. About registration and control of this process, article Shift control read the
๐ Previous registration
Overtime needs to be recorded and verified before it is done, not after.
๐ Monthly ceiling
A specific ceiling for each person to control costs and attrition.
๐งพ Documented payment
Payment based on logged and verifiable hours only.
Periodic comparison
The process of overtime every month should be compared with the previous month and the cause should be found.
Excellent night work, shift work and Friday work
In addition to overtime, the other three are very common in shift schedules. first, night work: Work in the hours between 22:00 and 06:00 for non-shift workers. 35% overtime has Second, shift work: Shift workers receive 10-22.5% overtime depending on the mix of their shifts (10% morning and evening, 15% morning and evening and night, 22.5% morning and night or evening and night). Its industrial details in the article Shift workers has come
third, Friday work: Friday is a weekly holiday and work on this day is considered overtime; It means that it is subject to the same 40 percent. Practical tip: In shift schedules where Friday is the normal working day of the cycle, it should be clear in advance what the situation is on Friday so that there are no differences at the end of the month. General rule: any rule written and not announced in advance, the end of the month will not be interpreted in favor of anyone; Write and publish.
Accurate recording of performance; From memory to document
Even the most detailed rules are ineffective without registration. The operation registration system must have three features: being daily (registration of the same day, not the end of the month), integrity (shift, leave, transfer and overtime in one place) and Being visible to the individual (so that the discrepancy can be seen soon). The memory of the end of the month is not reliable; The daily document is reliable.
According to the product documentation, in Axis Puls, the shift schedule and its changes (leave and handover) are registered in the same system and applied in the program, and each management level sees the performance report according to its access; That is, the basis of salary calculation is a registered and verifiable number, not several scattered lists. Practical advice for every workforce โ from nurses to line workers: keep your personal monthly document and compare it with your slip; Individual follow-up guide for nurses in the article the nurse has come
- Is the limit of each person's obligation specified and announced at the beginning of the course?
- Are overtimes done with prior registration and a specific ceiling?
- Are night work, Friday work and shift work counted with the correct percentage?
- Do leave and transfers have a registered document?
- Is the final function visible to the person before issuing the receipt?
Rest time, lunch and leave in the calculation of hours
As a general rule, Resting and eating time are not considered mandatory working hours, unless it is provided otherwise in the contract or agreement between the employer and the worker. For this reason, it should be clear in the schedule and contract how much is the daily rest period and whether the work component is calculated or not; Ambiguity in this small point becomes a big difference on the scale of months and years.
The same rule applies to leave: paid leave, sick leave and unpaid leave, each of them has a different effect on work and rights and must be recorded with a document. According to the product documentation, request Leave and assignment of shifts It is registered in the same system and after confirmation, the program is updated according to the new status; That is, the effect of leave on performance remains clear and traceable. For general principles of fair arrangement of turns, see Esq Shift adjustment read the
Complete the route: shift management, Shift workers, Shift control, Shift adjustment, Nurses shift and the nurse.
โ Frequently asked questions about working hours (FAQ)
Transparent operation, plug without difference
Try for two months in the real conditions of your collection and then decide.
Start of trial period